{"id":125752,"date":"2008-08-30T21:12:00","date_gmt":"2008-08-30T21:12:00","guid":{"rendered":"http:\/\/b13bd504-1dfb-11e4-aedf-250bc8c9958e"},"modified":"2008-08-30T21:12:00","modified_gmt":"2008-08-30T21:12:00","slug":"b13bd51d-1dfb-11e4-aedf-250bc8c9958e","status":"publish","type":"post","link":"https:\/\/www.saipantribune.com\/index.php\/b13bd51d-1dfb-11e4-aedf-250bc8c9958e\/","title":{"rendered":"Load Shedding Schedule"},"content":{"rendered":"<p>Editor\u2019s Note: The following schedule is for Aug. 30 through Sept. 5, 2008. <\/p>\n<p>The Commonwealth Utilities Corp. said that, due to ongoing mechanical repairs of the crankpin bearings on Engine 2, the load shedding schedule for the upcoming week has been amended to reflect the available power supply. Mechanical repairs on Engine 8 was to be completed by Friday; however, due additional unanticipated repairs, the completion time will not be until today. Currently, engines 3 and 6 are the only two units operational at Power Plant 1. CUC apologizes for any inconvenience the load shedding schedule has imposed on the community and will continue to work diligently to resolve the problem.<\/p>\n<p>8:00 a.m.-11 a.m.Feeder-1: Second Partial<br \/>\n\tUpper Navy Hill<br \/>\n\tUpper MIHA<br \/>\n\t99 Cent store<\/p>\n<p>Feeder-2: Entire Grid<br \/>\nPortions of Lower Base, CPA (Seaport), Beach Road Garapan south to San Jose intersection<\/p>\n<p>Feeder-7: Entire Grid<br \/>\nLower Base industrial area, north to Tanapag, Achugao, San Roque, As Matuis and Marpi<br \/>\n11:00 a.m.-2:00 p.m.\tFeeder-3: Second partial<br \/>\n\tUpper Gualo Rai<br \/>\n\tTaro Sue<\/p>\n<p>Kiya-1: Entire Grid<br \/>\nAs Terlaje, NMC, Portions of Fina Sisu, San Vicente to Botanical Garden, Lower Dandan Homestead, Upper Dandan Homestead, Isley Field<\/p>\n<p>Kiya-4: Entire Grid<br \/>\nChalan Kiya, San Jose, Oleai, Susupe, Mount Carmel and south to portions of Chalan Kanoa<\/p>\n<p>2:00 p.m.-5:00 p.m.\tFeeder-1: Second Partial<br \/>\n\t\t\tFeeder-1: Second Partial<br \/>\n\tUpper Navy Hill<br \/>\n\tUpper MIHA<br \/>\n\t99 Cent store<\/p>\n<p>Feeder-2: Entire Grid<br \/>\nPortions of Lower Base, CPA (Seaport), Beach Road Garapan south to San Jose intersection<\/p>\n<p>Feeder-7: Entire Grid<br \/>\nLower Base industrial area, north to Tanapag, Achugao, San Roque, As Matuis and Marpi<\/p>\n<p>5:00 p.m.-8:00 p.m.\tFeeder-3: Second partial<br \/>\n\tUpper Gualo Rai<br \/>\n\tTaro Sue<\/p>\n<p>Kiya-1: Entire Grid<br \/>\nAs Terlaje, NMC, Portions of Fina Sisu, San Vicente to Botanical Garden, Lower Dandan Homestead, Upper Dandan Homestead, Isley Field<\/p>\n<p>Kiya-4: Entire Grid<br \/>\nChalan Kiya, San Jose, Oleai, Susupe, Mount Carmel and south to portions of Chalan Kanoa<\/p>\n<p>8:00 p.m.-11:00 p.m.\tFeeder-4: Entire Grid<br \/>\nPortions of Lower Base, Sadog Tasi, Capital Hill, Kagman and portions of Papago (Botanical Garden)<\/p>\n<p>Kiya-2: Entire Grid<br \/>\nAs Lito, Koblerville, As Gonno, San Antonio and Afetnas, portions of Fina Sisu<\/p>\n<p>11:00 a.m.-2:00 am\tFeeder-3: Second partial<br \/>\n\tUpper Gualo Rai<br \/>\n\tTaro Sue <\/p>\n<p>Kiya 1: Entire Grid<br \/>\nAs Terlaje, NMC, Portions of Fina Sisu, San Vicente to Botanical Garden, Lower Dandan Homestead, Upper Dandan Homestead, Isley Field<\/p>\n<p>Kiya-4: Entire Gried<br \/>\nChalan Kiya, San Jose, Oleai, Suspe, Mount Carmel and south to portions of Chalan Kanoa<br \/>\n2:00 a.m.-5:00 a.m.\tFeeder-1: Second Partial\t\t\tUpper Navy Hill<br \/>\n\tUpper MIHA<br \/>\n\t99 Cent store<\/p>\n<p>Feeder-2: Entire Grid<br \/>\nPortions of Lower Base, CPA (Seaport), Beach Road Garapan south to San Jose intersection<\/p>\n<p>Feeder-7: Entire Grid<br \/>\nLower Base industrial area, north to Tanapag, Achugao, San Roque, As Matuis and Marpi<\/p>\n<p>5:00 a.m.-8:00 a.m.\tFeeder-4: Entire Grid<br \/>\nPortions of Lower Base, Sadog Tasi, Capital Hill, Kagman and portions of Papago (Botanical Garden)<\/p>\n<p>Kiya-2: Entire Grid<br \/>\nAs Lito, Koblerville, As Gonno, San Antonio, Afetnas, portions of Fina Sisu<\/p>\n<p>CUC will try to keep to this contingent schedule. It may, however, be modified in future public notices. In addition, the schedule may also be altered to address particular emergencies when necessary. [B][I](CUC)[\/I][\/B]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Commonwealth Utilities Corp. said that, due to ongoing mechanical repairs of the crankpin bearings on Engine 2, the load shedding schedule for the upcoming week has been amended to reflect the available power supply.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-125752","post","type-post","status-publish","format-standard","hentry","category-local-news"],"_links":{"self":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts\/125752","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/comments?post=125752"}],"version-history":[{"count":0,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts\/125752\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/media?parent=125752"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/categories?post=125752"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/tags?post=125752"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}