{"id":214141,"date":"2015-11-10T06:00:55","date_gmt":"2015-11-09T20:00:55","guid":{"rendered":"http:\/\/www.saipantribune.com\/?p=214141"},"modified":"2015-11-10T06:00:55","modified_gmt":"2015-11-09T20:00:55","slug":"leidos-wants-more-time-to-finalize-report-on-irp","status":"publish","type":"post","link":"https:\/\/www.saipantribune.com\/index.php\/leidos-wants-more-time-to-finalize-report-on-irp\/","title":{"rendered":"Leidos wants more time to finalize report on IRP"},"content":{"rendered":"<p>The consultant hired by the Commonwealth Utilities Corp. to analyze bids for an integrated resource management plan has asked for more time to finalize its report and give recommendations.<\/p>\n<p>In an executive session last Friday, CUC board members spoke with Leidos Engineering LLC.<\/p>\n<p>According to CUC\u00a0board chair\u00a0Adelina Roberto, the firm asked for a one-month extension to give its recommendations.<\/p>\n<p>\u201cThey don\u2019t have anything for us new other than what was the continuation from the last time,\u201d Roberto said.<\/p>\n<p>Leidos wasn\u2019t able to finish their presentation to the CUC board at their last meeting.<\/p>\n<p>\u201cThey didn\u2019t finish their report. They just did a presentation they\u2019re continuing on from the last time,\u201d Roberto said.<\/p>\n<p>She added that Leidos is working on their final draft.<\/p>\n<p>\u201cThey were supposed to give us the final draft today but it was not done,\u201d Roberto said.<\/p>\n<p>In August, Saipan Tribune reported that Leidos was down to five bids: \u201cRenewable 1\u201d which offers a range of solar generation, both with and without storage, with options for site control at specific feeders; \u201cRenewable 2\u201d which provides simple solar generation with 10-megawatt max capacity; \u201cThermal 1\u201d which has a project that involves diesel engines burning heavy fuel oil; \u201cThermal 2\u201d which has plans for diesel engines burning light fuel at 30 megawatt max capacity; and \u201cThermal 3\u201d which was described by Leidos as a project ranging from \u201cextending CUC\u2019s existing assets to new diesel engines burning light fuel.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The consultant hired by the Commonwealth Utilities Corp. to analyze bids for an integrated resource&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[3062,49,4568,38],"class_list":["post-214141","post","type-post","status-publish","format-standard","hentry","category-local-news","tag-adelina-roberto","tag-cuc","tag-irp","tag-saipan-tribune"],"_links":{"self":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts\/214141","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/comments?post=214141"}],"version-history":[{"count":0,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts\/214141\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/media?parent=214141"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/categories?post=214141"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/tags?post=214141"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}