{"id":295255,"date":"2019-03-11T06:00:14","date_gmt":"2019-03-10T20:00:14","guid":{"rendered":"https:\/\/www.saipantribune.com\/?p=295255"},"modified":"2019-03-11T06:00:14","modified_gmt":"2019-03-10T20:00:14","slug":"scheduled-power-interruptions-5","status":"publish","type":"post","link":"https:\/\/www.saipantribune.com\/index.php\/scheduled-power-interruptions-5\/","title":{"rendered":"Scheduled power interruptions"},"content":{"rendered":"<p>The Commonwealth Utilities Corp. would like to inform the public that there will be scheduled power interruptions on the following dates, times and locations:<\/p>\n<p>\u2022 Monday, March 11, 2019 \u2013 8am to 1pm<br \/>\nOutage type: Lateral outage on the Feeder 4 distribution circuit<br \/>\nVillage location: Talafofo Road<br \/>\nPower service area(s) affected:  Talafofo<br \/>\nWater service area(s) affected: None<br \/>\nWastewater service area(s) affected: None<br \/>\nPole replacement(s): 5<\/p>\n<p>\u2022 Monday, March 11, 2019 \u2013 8am to 4pm<br \/>\nOutage type: Sectionalized feeder outage on the Kiya 1 distribution circuit<br \/>\nVillage location: Isa Drive, Lower Papago<br \/>\nPower service area(s) affected:  Lao Lao Bay and Lower Papago<br \/>\nWater service area(s) affected: None<br \/>\nWastewater service area(s) affected: None<br \/>\nPole replacement(s): 9<\/p>\n<p>The purpose of the emergency power interruptions is to de-energize utility lines and allow power line workers from the CUC contracting company, Primary Source Electric, to safely replace 14 wooden poles with concrete ones along the villages of Talafofo and Lower Papago. The emergency power interruptions are part of CUC\u2019s resiliency program aimed at hardening and strengthening the power distribution system that was affected by Super Typhoon Yutu.<\/p>\n<p>Because of the scale of work that will be performed, CUC asks travelers to take alternate routes or to exercise caution when driving through the working area. <\/p>\n<p>For more information, contact the CUC Customer Call Center (664-4282) or monitor its Facebook page for the latest updates (https:\/\/www.facebook.com\/CommonwealthUtilitiesCorporation\/). <strong>(PR)<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Commonwealth Utilities Corp. would like to inform the public that there will be scheduled&#8230;<\/p>\n","protected":false},"author":28,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-295255","post","type-post","status-publish","format-standard","hentry","category-local-news"],"_links":{"self":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts\/295255","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/comments?post=295255"}],"version-history":[{"count":0,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts\/295255\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/media?parent=295255"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/categories?post=295255"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/tags?post=295255"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}