{"id":295391,"date":"2019-03-13T20:03:29","date_gmt":"2019-03-13T10:03:29","guid":{"rendered":"https:\/\/www.saipantribune.com\/?p=295391"},"modified":"2019-03-13T20:03:29","modified_gmt":"2019-03-13T10:03:29","slug":"scheduled-power-interruptions-7","status":"publish","type":"post","link":"https:\/\/www.saipantribune.com\/index.php\/scheduled-power-interruptions-7\/","title":{"rendered":"Scheduled power interruptions"},"content":{"rendered":"<p>The Commonwealth Utilities Corp. would like to inform the public that there will be scheduled power interruptions on the following dates, times, and locations:<\/p>\n<p><strong>Wednesday, March 13, 2019 \u2013 8am to 4pm <\/strong><br \/>\n\u2022 Outage type: Sectionalized Feeder outage on the Feeder 4 distribution circuit<br \/>\n\u2022 Village location: Isa Drive, Lower Papago<br \/>\n\u2022 Power service area(s) affected:  Lower Papago<br \/>\n\u2022 Water service area(s) affected: None<br \/>\n\u2022 Wastewater service area(s) affected: None<br \/>\n\u2022 Work to be performed: Replace nine wooden poles with concrete ones<\/p>\n<p><strong>Thursday, March 14, 2019 \u2013 6:30am to 11:30am <\/strong><br \/>\n\u2022 Outage type: Sectionalized Feeder outage on the Feeder 2 distribution circuit<br \/>\n\u2022 Village location: Oleai<br \/>\n\u2022 Power service area(s) affected: Oleai<br \/>\n\u2022 Water service area(s) affected: None<br \/>\n\u2022 Wastewater service area(s) affected: S-12<br \/>\n\u2022 Work to be performed: Reset four concrete poles to proper depth <\/p>\n<p><strong>Thursday, March 14, 2019 \u2013 8am to 4pm <\/strong><br \/>\n\u2022 Outage type: Sectionalized Feeder outage on the Kiya 1distribution circuit<br \/>\n\u2022 Village location: Dandan<br \/>\n\u2022 Power service area(s) affected:  Saipan International Airport and As Perdido<br \/>\n\u2022 Water service affected: None<br \/>\n\u2022 Wastewater service area(s) affected: None<br \/>\n\u2022 Work to be performed: Replace 11 wooden poles with concrete ones (PR)<\/p>\n<p><strong>Thursday, March 14, 2019 \u2013 4pm to 6pm<\/strong><br \/>\n\u2022 Outage type: Sectionalized Feeder outage on the Kiya 4 distribution circuit<br \/>\n\u2022 Villages: San Jose, Oleai, Susupe, Chalan Kanoa, Chalan Piao and San Antonio<br \/>\n\u2022 Power service area(s) affected:  San Jose, Oleai, Susupe, Chalan Kanoa, Chalan Piao and San Antonio<br \/>\n\u2022 Water service area(s) affected: None<br \/>\n\u2022 Wastewater service area(s) affected: W-5, A-4, A-5 and A-6<br \/>\n\u2022 Work to be performed: Maintenance <\/p>\n<p><strong>Friday, March 15, 2019 \u2013 8am to 1pm <\/strong><br \/>\n\u2022 Outage type: Sectionalized feeder outage on the Feeder 4 distribution circuit<br \/>\n\u2022 Village location: Kagman 1 and Kagman 2<br \/>\n\u2022 Power service area(s) affected:  Kagman 1 and Kagman 2<br \/>\n\u2022 Water well(s) affected: KG-19, KG-7, KG-8 and KG-14<br \/>\n\u2022 Water service area(s) affected: Kagman 1 and Kagman 2 may be affected depending on tank level<br \/>\n\u2022 Wastewater service area(s) affected: None<br \/>\n\u2022 Work to be performed: Replace seven (7) wooden poles with concrete poles<\/p>\n<p><strong>Saturday, March 16, 2019 \u2013 8am to 4pm<\/strong><br \/>\n\u2022 Outage type: Sectionalized feeder outage on the Kiya 2 distribution circuit<br \/>\n\u2022 Village location: Koblerville<br \/>\n\u2022 Power service area(s) affected:  Koblerville<br \/>\n\u2022 Water well(s) affected: None<br \/>\n\u2022 Water service area(s) affected: None<br \/>\n\u2022 Wastewater service area(s) affected: None<br \/>\n\u2022 Work to be performed: Replace ten (10) wooden poles with concrete poles<\/p>\n<p><strong>Saturday, March 16, 2019 \u2013 8:30am to 1:30pm <\/strong><br \/>\n\u2022 Outage type: Sectionalized lateral outage on the Feeder 7 distribution circuit<br \/>\n\u2022 Village location: As Matuis<br \/>\n\u2022 Power service area(s) affected:  Binadu Drive<br \/>\n\u2022 Water well(s) affected: As Matuis Well Field<br \/>\n\u2022 Water service area(s) affected: As Matuis, San Roque, Tanapag and Lower Base may be affected depending on tank level<br \/>\n\u2022 Wastewater service area(s) affected: None<br \/>\n\u2022 Work to be performed: Replace four (4) wooden poles with concrete poles<\/p>\n<p><strong>Sunday, March 17, 2019 \u2013 8am to 1pm <\/strong><br \/>\n\u2022 Outage type: Sectionalized lateral outage on the Kiya 2 distribution circuit<br \/>\n\u2022 Village location: Koblerville<br \/>\n\u2022 Power service area(s) affected:  Koblerville<br \/>\n\u2022 Water well(s) affected: None<br \/>\n\u2022 Water service area(s) affected: None<br \/>\n\u2022 Wastewater service area(s) affected: None<br \/>\n\u2022 Work to be performed: Replace four (4) wooden poles with concrete poles<\/p>\n<p><strong>Sunday, March 17, 2019 \u2013 8am to 1pm <\/strong><br \/>\n\u2022 Outage type: Sectionalized feeder outage on the Feeder 1 and Feeder 3 double distribution circuit<br \/>\n\u2022 Village location: China Town, Middle Road<br \/>\n\u2022 Power service area(s) affected:  China Town<br \/>\n\u2022 Water well(s) affected: As Falape Booster<br \/>\n\u2022 Water service area(s) affected: As Falape<br \/>\n\u2022 Wastewater service area(s) affected: None<br \/>\n\u2022 Work to be performed: Replace four (4) wooden poles with concrete poles<\/p>\n<p><strong>Monday, March 18, 2019 \u2013 8:30am to 1:30pm <\/strong><br \/>\n\u2022 Outage type: Sectionalized lateral feeder outage on the Feeder 7 distribution circuit<br \/>\n\u2022 Village location: As Matuis<br \/>\n\u2022 Power service area(s) affected:  Binadu Drive<br \/>\n\u2022 Water well(s) affected: As Matuis Well Field<br \/>\n\u2022 Water service area(s) affected: As Matuis, San Roque, Tanapag and Lower Base may be affected depending on tank level<br \/>\n\u2022 Wastewater service area(s) affected: None<br \/>\n\u2022 Work to be performed: Replace four (4) wooden poles with concrete poles<\/p>\n<p><strong>Tuesday, March 19, 2019 \u2013 8:30am to 2pm <\/strong><br \/>\n\u2022 Outage type: Sectionalized lateral feeder outage on the Feeder 7 distribution circuit<br \/>\n\u2022 Village location: As Matuis<br \/>\n\u2022 Power service area(s) affected:  Binadu Drive<br \/>\n\u2022 Water well(s) affected: As Matuis Well Field<br \/>\n\u2022 Water service area(s) affected: As Matuis, San Roque, Tanapag and Lower Base may be affected depending on tank level<br \/>\n\u2022 Wastewater service area(s) affected: None<br \/>\n\u2022 Work to be performed: Replace four (4) wooden poles with concrete poles<\/p>\n<p><strong>Wednesday, March 20, 2019 \u2013 11am to 6pm <\/strong><br \/>\n\u2022 Outage type: Sectionalized lateral feeder outage on the Feeder 7 distribution circuit<br \/>\n\u2022 Village location: As Matuis<br \/>\n\u2022 Power service area(s) affected:  RTE 320 and Binadu Drive<br \/>\n\u2022 Water well(s) affected: As Matuis Well Field<br \/>\n\u2022 Water service area(s) affected: As Matuis, San Roque, Tanapag and Lower Base will be affected during the duration of the power outage<br \/>\n\u2022 Wastewater service area(s) affected: None<br \/>\n\u2022 Work to be performed: Replace eight (8) wooden poles with concrete poles<\/p>\n<p><strong>Thursday, March 21, 2019 \u2013 8:30am to 1:30pm <\/strong><br \/>\n\u2022 Outage type: Sectionalized lateral feeder outage on the Feeder 7 distribution circuit<br \/>\n\u2022 Village location: As Matuis<br \/>\n\u2022 Power service area(s) affected:  RTE 320<br \/>\n\u2022 Water well(s) affected: As Matuis Well Field<br \/>\n\u2022 Water service area(s) affected: As Matuis, San Roque, Tanapag and Lower Base may be affected depending on tank level<br \/>\n\u2022 Wastewater service area(s) affected: None<br \/>\n\u2022 Work to be performed: Replace five (5) wooden poles with concrete poles<\/p>\n<p>The purpose of the scheduled power interruptions is to de-energize utility lines and allow power line workers from CUC and the contracting company, Primary Source Electric, to safely replace wooden poles with concrete ones and conduct maintenance of the system around Saipan.  <\/p>\n<p>Because of the scale of work that will be performed, CUC asks travelers to take alternate routes or to exercise caution when driving through the working area. <\/p>\n<p>For more information, contact the CUC Customer Call Center (664-4282) or monitor its Facebook page for the latest updates (https:\/\/www.facebook.com\/CommonwealthUtilitiesCorporation\/). <strong>(PR)<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Commonwealth Utilities Corp. would like to inform the public that there will be scheduled&#8230;<\/p>\n","protected":false},"author":28,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-295391","post","type-post","status-publish","format-standard","hentry","category-local-news"],"_links":{"self":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts\/295391","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/comments?post=295391"}],"version-history":[{"count":0,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts\/295391\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/media?parent=295391"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/categories?post=295391"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/tags?post=295391"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}