{"id":295705,"date":"2019-03-19T06:06:45","date_gmt":"2019-03-18T20:06:45","guid":{"rendered":"https:\/\/www.saipantribune.com\/?p=295705"},"modified":"2019-03-19T06:06:45","modified_gmt":"2019-03-18T20:06:45","slug":"scheduled-power-interruptions-8","status":"publish","type":"post","link":"https:\/\/www.saipantribune.com\/index.php\/scheduled-power-interruptions-8\/","title":{"rendered":"Scheduled power interruptions"},"content":{"rendered":"<p>The Commonwealth Utilities Corp. would like to inform the public that there will be scheduled power interruptions on the following dates, times and locations:<\/p>\n<p> Tuesday, March 19, 2019 \u2014 8am to 4pm<br \/>\n\t\u2022\tOutage type: Sectionalized feeder outage on the Kiya 4 distribution circuit<br \/>\n\t\u2022\tVillage location: Chalan Kanoa<br \/>\n\t\u2022\tPower service area(s) affected: Susupe and Chalan Kanoa<br \/>\n\t\u2022\tWater service area(s) affected: None<br \/>\n\t\u2022\tWastewater service area(s) affected: A-4, A-5, A-6, A-9 and A-11<br \/>\n\t\u2022\tWork to be performed: Replace two wooden poles with concrete poles <\/p>\n<p>Wednesday, March 20, 2019 \u2013 8am to 4pm<br \/>\n\t\u2022\tOutage type: Sectionalized feeder outage on the Kiya 1 and Kiya 2 double distribution circuit<br \/>\n\t\u2022\tVillage location: As Terlaje<br \/>\n\t\u2022\tPower service area(s) affected: As Terlaje and Lower San Vicente<br \/>\n\t\u2022\tWater well(s) affected: As Terlaje Booster<br \/>\n\t\u2022\tWater service area(s) affected: None<br \/>\n\t\u2022\tWastewater service area(s) affected: W-6<br \/>\n\t\u2022\tWork to be performed: Replace ten (10) wooden poles with concrete poles<\/p>\n<p> Thursday, March 21, 2019 \u2013 8am to 4pm<br \/>\n\t\u2022\tOutage type: Sectionalized feeder outage on the Kiya 1 and Kiya 2 double distribution circuit<br \/>\n\t\u2022\tVillage location: As Terlaje<br \/>\n\t\u2022\tPower service area(s) affected: As Terlaje and Lower San Vicente<br \/>\n\t\u2022\tWater well(s) affected: As Terlaje Booster<br \/>\n\t\u2022\tWater service area(s) affected: None<br \/>\n\t\u2022\tWastewater service area(s) affected: W-6<br \/>\n\t\u2022\tWork to be performed: Replace ten (10) wooden poles with concrete poles<\/p>\n<p> Friday, March 22, 2019 \u2013 8am to 4pm<br \/>\n\t\u2022\tOutage type: Sectionalized feeder outage on the Kiya 1 and Kiya 2 double distribution circuit<br \/>\n\t\u2022\tVillage location: As Terlaje<br \/>\n\t\u2022\tPower service area(s) affected: As Terlaje and Lower San Vicente<br \/>\n\t\u2022\tWater well(s) affected: As Terlaje Booster<br \/>\n\t\u2022\tWater service area(s) affected: None<br \/>\n\t\u2022\tWastewater service area(s) affected: W-6<br \/>\n\t\u2022\tWork to be performed: Replace ten (10) wooden poles with concrete poles<\/p>\n<p> Saturday, March 23, 2019 \u2013 8am to 4pm<br \/>\n\t\u2022\tOutage type: Sectionalized feeder outage on the Feeder 4 distribution circuit<br \/>\n\t\u2022\tVillage location: Kagman Mobile Gas Station and Kagman 1<br \/>\n\t\u2022\tPower service area(s) affected: Kagman 1, Kagman 2 and Kagman 3<br \/>\n\t\u2022\tWater well(s) affected: All Kagman Wells<br \/>\n\t\u2022\tWater service area(s) affected: Entire Kagman Area<br \/>\n\t\u2022\tWastewater service area(s) affected: None<br \/>\n\t\u2022\tWork to be performed: Replace two (2) wooden poles with concrete poles<\/p>\n<p> Sunday, March 24, 2019 \u2013 8am to 4pm<br \/>\n\t\u2022\tOutage type: Sectionalized feeder outage on the Feeder 4 distribution circuit<br \/>\n\t\u2022\tVillage location: Kagman 1 and Kagman 2<br \/>\n\t\u2022\tPower service area(s) affected: Kagman 1, Kagman 2 and Kagman 3<br \/>\n\t\u2022\tWater well(s) affected: All Kagman wells except KG-2, KG-3, KG-4, KG-10 and<br \/>\n\t\u2022\tKG-131<br \/>\n\t\u2022\tWater service area(s) affected: Entire Kagman Area<br \/>\n\t\u2022\tWastewater service area(s) affected: None<br \/>\n\t\u2022\tWork to be performed: Replace seven (7) wooden poles with concrete poles<\/p>\n<p>The purpose of the scheduled power interruptions is to de-energize utility lines and allow power line workers from the company Primary Source Electric to safely replace wooden poles with concrete ones. This is a continuation of CUC\u2019s ongoing restoration effort, which is aimed at hardening and strengthening the power distribution system affected by Super Typhoon Yutu.<\/p>\n<p>Because of the scale of work that will be performed, CUC asks travelers to take alternate routes or to exercise caution when driving through the working area. <\/p>\n<p>For more information, contact the CUC Customer Call Center (664-4282) or monitor our Facebook page for the latest updates (https:\/\/www.facebook.com\/CommonwealthUtilitiesCorporation\/). (PR)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Commonwealth Utilities Corp. would like to inform the public that there will be scheduled&#8230;<\/p>\n","protected":false},"author":28,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-295705","post","type-post","status-publish","format-standard","hentry","category-local-news"],"_links":{"self":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts\/295705","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/comments?post=295705"}],"version-history":[{"count":0,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts\/295705\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/media?parent=295705"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/categories?post=295705"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/tags?post=295705"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}