{"id":296559,"date":"2019-04-01T06:00:05","date_gmt":"2019-03-31T20:00:05","guid":{"rendered":"https:\/\/www.saipantribune.com\/?p=296559"},"modified":"2019-04-01T06:00:05","modified_gmt":"2019-03-31T20:00:05","slug":"scheduled-power-interruptions-12","status":"publish","type":"post","link":"https:\/\/www.saipantribune.com\/index.php\/scheduled-power-interruptions-12\/","title":{"rendered":"Scheduled power interruptions"},"content":{"rendered":"<p>The Commonwealth Utilities Corp. would like to inform the public that there will be scheduled power interruptions on the following dates, times and locations:<\/p>\n<p><strong>Monday, April 1, 2019, 8am to 4pm<\/strong><br \/>\n\u2022 Outage type: Sectionalized feeder outage on the Feeder 4 distribution circuit<br \/>\n\u2022 Village location: Kagman 3<br \/>\n\u2022 Power service area(s) affected: Algeta Drive Kagman 2 and Kagman 3<br \/>\n\u2022 Water service area(s) affected: None<br \/>\n\u2022 Wastewater service area(s) affected: None<br \/>\n\u2022 Work to be performed: Replace six wooden poles with concrete ones<\/p>\n<p><strong>Monday, April 1, 2019, 8:30am to 1:30pm<\/strong><br \/>\n\u2022 Outage type: Sectionalized feeder outage on the Kiya 1 distribution circuit<br \/>\n\u2022 Village location: Obyan<br \/>\n\u2022 Power service area(s) affected: None<br \/>\n\u2022 Water service area(s) affected: None<br \/>\n\u2022 Wastewater service area(s) affected: None<br \/>\n\u2022 Work to be performed: Replace four wooden poles with concrete ones<\/p>\n<p><strong>Tuesday, April 2, 2019, 8am to 4pm<\/strong><br \/>\n\u2022 Outage type: Sectionalized feeder outage on the Kiya 1 distribution circuit<br \/>\n\u2022 Village location: Chalan Monsignor Guerrero, Dandan<br \/>\n\u2022 Power service area(s) affected:  Chalan Monsignor Guerrero, Dandan<br \/>\n\u2022 Water service area(s) affected: None<br \/>\n\u2022 Wastewater service area(s) affected: None<br \/>\n\u2022 Work to be performed: Replace four wooden poles with concrete ones<\/p>\n<p><strong>Tuesday, April 2, 2019, 8:30am to 1:30pm<\/strong><br \/>\n\u2022 Outage type: Sectionalized feeder outage on the Kiya 1 distribution circuit<br \/>\n\u2022 Village location: Obyan<br \/>\n\u2022 Power service area(s) affected:  None<br \/>\n\u2022 Water service well(s) affected: None<br \/>\n\u2022 Wastewater service area(s) affected: None<br \/>\n\u2022 Work to be performed: Replace four (4) wooden poles with concrete ones<\/p>\n<p><strong>Wednesday, April 3, 2019, 8am to 4pm <\/strong><br \/>\n\u2022 Outage type: Sectionalized feeder outage on the Kiya 1 distribution circuit<br \/>\n\u2022 Village location: Chalan Monsignor Guerrero, Dandan<br \/>\n\u2022 Power service area(s) affected:  Chalan Monsignor Guerrero, Dandan<br \/>\n\u2022 Water service area(s) affected: None<br \/>\n\u2022 Wastewater service area(s) affected: A-13 and A-14<br \/>\n\u2022 Work to be performed: Replace four wooden poles with concrete ones<\/p>\n<p><strong>Wednesday, April 3, 2019, 8:30am to 1:30pm<\/strong><br \/>\n\u2022 Outage type: Sectionalized feeder outage on the Kiya 1 distribution circuit<br \/>\n\u2022 Village location: Obyan<br \/>\n\u2022 Power service area(s) affected:  None<br \/>\n\u2022 Water service area(s) affected: None<br \/>\n\u2022 Wastewater service area(s) affected: None<br \/>\n\u2022 Pole replacement(s): Replace four wooden poles with concrete ones<\/p>\n<p>The purpose of the scheduled power interruptions is to de-energize utility lines and allow power line workers from CUC and its contracting company, Primary Source Electric, to safely replace 26 wooden poles with concrete ones. This is part of CUC\u2019s ongoing effort to complete restoration work resulting from the system damage caused by Super Typhoon Yutu and CUC\u2019s Water System Mitigation Project, which are both aimed at hardening and strengthening the power distribution system.<\/p>\n<p>Because of the scale of work that will be performed, CUC asks travelers to take alternate routes or to exercise caution when driving through the working area. <\/p>\n<p>For more information, contact the CUC Customer Call Center (664-4282) or monitor its Facebook page for the latest updates (https:\/\/www.facebook.com\/CommonwealthUtilitiesCorporation\/). (PR)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Commonwealth Utilities Corp. would like to inform the public that there will be scheduled&#8230;<\/p>\n","protected":false},"author":28,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-296559","post","type-post","status-publish","format-standard","hentry","category-local-news"],"_links":{"self":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts\/296559","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/comments?post=296559"}],"version-history":[{"count":0,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts\/296559\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/media?parent=296559"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/categories?post=296559"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/tags?post=296559"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}