{"id":298309,"date":"2019-04-26T06:00:50","date_gmt":"2019-04-25T20:00:50","guid":{"rendered":"https:\/\/www.saipantribune.com\/?p=298309"},"modified":"2019-04-26T06:00:50","modified_gmt":"2019-04-25T20:00:50","slug":"scheduled-power-interruptions-19","status":"publish","type":"post","link":"https:\/\/www.saipantribune.com\/index.php\/scheduled-power-interruptions-19\/","title":{"rendered":"Scheduled power interruptions"},"content":{"rendered":"<p>There will be scheduled power interruptions on the following dates, times and locations: <\/p>\n<p><strong>Monday, April 29, 2019 \u2014 8:30am to 9am <\/strong><br \/>\n\u2022 Outage type: Sectionalized lateral outage on the Kiya 1 distribution circuit<br \/>\n\u2022 Village location: Dandan<br \/>\n\u2022 Power service area(s) affected: Sky Chef to ARFF Facility<br \/>\n\u2022 Water service area(s) affected: As Terlaje, Dandan and Kannat Tabla may be affected depending on tank level<br \/>\n\u2022 Wastewater service area(s) affected: None<br \/>\n\u2022 Work to be performed: Replace five wooden poles with concrete ones<\/p>\n<p><strong>Wednesday, May 1, 2019 \u2014 8:30am to 1:30pm<\/strong><br \/>\n\u2022 Outage type: Sectionalized feeder outage on the Kiya 1 distribution circuit<br \/>\n\u2022 Village location: Dandan<br \/>\n\u2022 Power service area(s) affected: None<br \/>\n\u2022 Water service area(s) affected: As Terlaje, Dandan and Kannat Tabla may be affected depending on tank level<br \/>\n\u2022 Wastewater service area(s) affected: None<br \/>\n\u2022 Work to be performed: Replace seven wooden poles with concrete ones <\/p>\n<p><strong>Friday, May 3, 2019 \u2014 8:30am to 1:30pm  <\/strong><br \/>\n\u2022 Outage type: Sectionalized feeder outage on the Kiya 1 distribution circuit<br \/>\n\u2022 Village location: None<br \/>\n\u2022 Power service area(s) affected: None<br \/>\n\u2022 Water service area(s) affected: As Terlaje, Dandan and Kannat Tabla may be affected depending on tank level<br \/>\n\u2022 Wastewater service area(s) affected: None<br \/>\n\u2022 Work to be performed: Replace sevenwooden poles with concrete ones<\/p>\n<p><strong>Sunday, May 5, 2019 \u2014 8am to 4pm <\/strong><br \/>\n\u2022 Outage type: Sectionalized feeder outage on the Kiya 4 distribution circuit<br \/>\n\u2022 Village location: Chalan Kiya<br \/>\n\u2022 Power service area(s) affected: Chalan Kiya<br \/>\n\u2022 Water service area(s) affected: None<br \/>\n\u2022 Wastewater service area(s) affected: None<br \/>\n\u2022 Work to be performed: Replace one wooden pole with a concrete one<\/p>\n<p>The purpose of these power interruptions is to de-energize utility lines and allow power line workers from the Commonwealth Utilities Corp. and its contracting company, Primary Source Electric, to safely replace 20 wooden poles with concrete ones.<\/p>\n<p>For more information, contact the CUC Customer Call Center (664-4282) or monitor its Facebook page for the latest updates (https:\/\/www.facebook.com\/CommonwealthUtilitiesCorporation\/). <strong>(PR)<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>There will be scheduled power interruptions on the following dates, times and locations: Monday, April&#8230;<\/p>\n","protected":false},"author":28,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-298309","post","type-post","status-publish","format-standard","hentry","category-local-news"],"_links":{"self":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts\/298309","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/comments?post=298309"}],"version-history":[{"count":0,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts\/298309\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/media?parent=298309"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/categories?post=298309"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/tags?post=298309"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}