{"id":300027,"date":"2019-05-23T06:00:32","date_gmt":"2019-05-22T20:00:32","guid":{"rendered":"https:\/\/www.saipantribune.com\/?p=300027"},"modified":"2019-05-23T06:00:32","modified_gmt":"2019-05-22T20:00:32","slug":"scheduled-power-interruptions-29","status":"publish","type":"post","link":"https:\/\/www.saipantribune.com\/index.php\/scheduled-power-interruptions-29\/","title":{"rendered":"SCHEDULED POWER INTERRUPTIONS"},"content":{"rendered":"<p>The Commonwealth Utilities Corp. has updated its scheduled power interruptions for May 22-25 due to the early completion of Primary Source Electric\u2019s work these past few days.<\/p>\n<p><strong>WEDNESDAY, MAY 22, 2019 \u2013 7:30am to 6:30pm <\/strong><br \/>\n\u2022 Outage type: Sectionalized lateral outage on the Kiya 2 distribution circuit<br \/>\n\u2022 Village location: San Antonio<br \/>\n\u2022 Power service area(s) affected: Chalan Monsignor Road, San Antonio (energized at 9:40 a.m.), Pacific Islands Club will remain offline until 6:30pm<br \/>\n\u2022 Water service area(s) affected: None<br \/>\n\u2022 Wastewater service area(s) affected: None<br \/>\n\u2022 Work to be performed: Replace damaged power lines with new power lines<\/p>\n<p><strong>THURSDAY, MAY 23, 2019 \u2013 7:30am to 6:30pm<\/strong><br \/>\n\u2022 Outage type: Sectionalized lateral outage on the Kiya 2 distribution circuit<br \/>\n\u2022 Village location: San Antonio<br \/>\n\u2022 Power service area(s) affected: Pacific Islands Club<br \/>\n\u2022 Water service area(s) affected: None<br \/>\n\u2022 Wastewater service area(s) affected: None<br \/>\n\u2022 Work to be performed: Replace damaged power lines with new power lines<\/p>\n<p><strong>THURSDAY, MAY 23, 2019 \u2013 7:30am to 6:30p<\/strong>m<br \/>\n\u2022 Outage type: Sectionalized lateral outage on the Kiya 1 distribution circuit<br \/>\n\u2022 Village location: Dandan<br \/>\n\u2022 Power service area(s) affected: ARFF and Skydive Saipan<br \/>\n\u2022 Water service area(s) affected: None<br \/>\n\u2022 Wastewater service area(s) affected: None<br \/>\n\u2022 Work to be performed: Replace damaged power lines with new power lines<\/p>\n<p><strong>FRIDAY, MAY 24, 2019 \u2013 7:30am to 6:30pm <\/strong><br \/>\n\u2022 Outage type: Sectionalized lateral outage on the Kiya 2 distribution circuit<br \/>\n\u2022 Village location: Koblerville<br \/>\n\u2022 Power service area(s) affected: Portions of Chalan Monsignor Martinez Road, Koblerville (for residents along the Korean Methodist Church to the Koblerville Mobil Gas Station).  See map for further details.<br \/>\n\u2022 Water service area(s) affected: None<br \/>\n\u2022 Wastewater service area(s) affected: None<br \/>\n\u2022 Work to be performed: Replace damaged power lines with new power lines<\/p>\n<p><strong>SATURDAY, MAY 25, 2019 \u2013 7:30am to 6:30pm <\/strong><br \/>\n\u2022 Outage type: Sectionalized lateral outage on the Kiya 2 distribution circuit<br \/>\n\u2022 Village location: Koblerville<br \/>\n\u2022 Power service area(s) affected: Portions of Chalan Monsignor Martinez Road, Koblerville (for residents along the Korean Methodist Church to the Koblerville Mobil Gas Station).  See map for further details.<br \/>\n\u2022 Water service area(s) affected: None<br \/>\n\u2022 Wastewater service area(s) affected: None<br \/>\n\u2022 Work to be performed: Replace damaged power lines with new power lines<\/p>\n<p>The purpose of the scheduled power interruptions is to de-energize utility lines and allow power line workers from PSE to safely conduct maintenance associated with the ongoing restoration effort in the aforementioned locations. <\/p>\n<p>Because of the scale of work that will be performed, CUC asks travelers to take alternate routes or to exercise caution when driving through the working area.<\/p>\n<p>As a result of the hardening tasks, CUC\u2019s power distribution system will be stronger and much more reliable during a natural disaster.   <\/p>\n<p>For more information, contact the CUC Customer Call Center (664-4282) or monitor its Facebook page for the latest updates (https:\/\/www.facebook.com\/CommonwealthUtilitiesCorporation\/). <strong>(PR)<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Commonwealth Utilities Corp. has updated its scheduled power interruptions for May 22-25 due to&#8230;<\/p>\n","protected":false},"author":28,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[13903,23506,19090,23511],"class_list":["post-300027","post","type-post","status-publish","format-standard","hentry","category-local-news","tag-friday","tag-saturday","tag-thursday","tag-wednesday"],"_links":{"self":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts\/300027","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/comments?post=300027"}],"version-history":[{"count":0,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts\/300027\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/media?parent=300027"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/categories?post=300027"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/tags?post=300027"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}