{"id":326618,"date":"2020-07-20T06:04:14","date_gmt":"2020-07-19T20:04:14","guid":{"rendered":"https:\/\/www.saipantribune.com\/?p=326618"},"modified":"2020-07-20T06:04:14","modified_gmt":"2020-07-19T20:04:14","slug":"cuc-advisories-july-20-2020","status":"publish","type":"post","link":"https:\/\/www.saipantribune.com\/index.php\/cuc-advisories-july-20-2020\/","title":{"rendered":"CUC ADVISORIES &#8211; July 20, 2020"},"content":{"rendered":"<p><strong>Scheduled water outage in San Roque, Achugao, Tanapag <\/strong><\/p>\n<p>There will be a scheduled water service interruption in San Roque, Achugao and Tanapag on Thursday, July 23, 2020, from 8am to 6pm, due to a 12-inch main line break at the entrance of Esmeralda Street in San Roque. Water operations personnel of the Commonwealth Utilities Corp. will be making the necessary repairs. Customers in the affected areas should expect restoration of water service soon after. Motorists are also advised to proceed with caution when traveling through the Chaim Pale Arnold area as the northbound outer lane will be closed for repairs.<br \/>\nFor more information, contact the CUC Customer Call Center (664-4282) or monitor its Facebook page for the latest updates (https:\/\/www.facebook.com\/CommonwealthUtilitiesCorporation\/). (PR)<\/p>\n<p><strong>Scheduled power interruptions on July 22, 23<\/strong><\/p>\n<p>The Commonwealth Utilities Corp. would like to inform the public that there will be scheduled power interruptions on July 22 and 23, 2020.<br \/>\nAs CUC continues its ongoing system maintenance, there will be scheduled power interruptions to de-energize utility lines such that CUC linemen are able to safely perform line clearing on primary lines and to straighten a leaning transformer primary pole as a result of Super Typhoon Yutu within the affected areas of Gualo Rai and Navy Hill. Because of the scale of work that will be performed, CUC asks travelers to take alternate routes or to exercise caution when driving through the working area.<br \/>\n Wednesday, July 22, 2020 \u2014 9am to 11am<br \/>\n\t\u2022\tOutage type: Sectionalized outage on the Feeder 1 circuit<br \/>\n\t\u2022\tProject location: Navy Hill<br \/>\n\t\u2022\tPower service area(s) affected: Navy Hill (Delgado Dr., Fitme Pl., Kotdura Ln., Manehante Av., Victoria Av., Mayoria Av., Isla Dr., Fuetsa Lp., Documento Ln., Gurupu Dr., Rekto Dr., Suheta Pl., and Dinana Ln. These areas are from the baseball field, lateral going to OVR and down toward the Tan mansion)<br \/>\n\t\u2022\tWater well(s) affected: None<br \/>\n\t\u2022\tWastewater lift station(s) affected: None<br \/>\n Thursday, July 23, 2020 \u2014 8:30am to 12:30pm.<br \/>\n\t\u2022\tOutage type: Sectionalized outage on the Kiya 3 circuit<br \/>\n\t\u2022\tProject location: Gualo Rai<br \/>\n\t\u2022\tPower service area(s) affected: Portions of Gualo Rai (only the lateral between Pizza Hut and Lin SHR Inc. Hardware Store)<br \/>\n\t\u2022\tWater well(s) affected: None<br \/>\n\t\u2022\tWastewater lift station(s) affected: None<br \/>\nFor more information, contact the CUC hotline (236-4333) or monitor its Facebook page for the latest updates (https:\/\/www.facebook.com\/CommonwealthUtilitiesCorporation\/). (PR)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Scheduled water outage in San Roque, Achugao, Tanapag There will be a scheduled water service&#8230;<\/p>\n","protected":false},"author":28,"featured_media":326616,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[1495],"class_list":["post-326618","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-local-news","tag-san-roque"],"_links":{"self":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts\/326618","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/comments?post=326618"}],"version-history":[{"count":0,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts\/326618\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/media\/326616"}],"wp:attachment":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/media?parent=326618"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/categories?post=326618"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/tags?post=326618"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}