{"id":329795,"date":"2020-09-15T06:02:47","date_gmt":"2020-09-14T20:02:47","guid":{"rendered":"https:\/\/www.saipantribune.com\/?p=329795"},"modified":"2020-09-15T06:02:47","modified_gmt":"2020-09-14T20:02:47","slug":"navfac-awards-japan-funded-contract-for-projects-in-marine-corps-base-guam","status":"publish","type":"post","link":"https:\/\/www.saipantribune.com\/index.php\/navfac-awards-japan-funded-contract-for-projects-in-marine-corps-base-guam\/","title":{"rendered":"NAVFAC awards Japan-funded contract  for projects in Marine Corps Base Guam"},"content":{"rendered":"<p>JOINT BASE PEARL HARBOR-HICKAM\u2014Naval Facilities Engineering Command Pacific awarded a $36 million firm-fixed price contract Sept. 9 to Pacific Rim Constructors, Inc., a small business of Dededo, Guam, for the construction of utilities and site improvements phase II main and commercial gates at Marine Corps Base, Guam. <\/p>\n<p>The contract supports the Defense Policy Review Initiative and is funded by the Government of Japan as part of the International Agreement between the United States and Japan. <\/p>\n<p>\u201cThe contract award is a key milestone for the Officer in Charge of Construction Marine Corps Marianas and Camp Blaz as it will provide the main and commercial entrance for the installation and will be the first line of force protection,\u201d said OICC MCM commanding officer Capt. Steven Stasick. \u201cIt is exciting to see the progress being made on Guam\u2019s new Marine Corps Base.\u201d <\/p>\n<p>The work to be performed includes, but is not limited to, construction of a main gate and a commercial\/tactical vehicle gate to provide installation security for Marine Corps Base Guam and meet Anti-Terrorism Force Protection and unified facilities criteria requirements. <\/p>\n<p>Main gate facilities include an entry canopy with guard booths and pedestals, a gate house, an overwatch enclosure, a utility building, a search area with a canopy, and a visitor control center building with a parking lot for visitor privately owned vehicles (POVs). Commercial gate facilities include a primary canopy with guard booths and pedestals, pull-off POV inspection area, gate house\/search office, an overwatch tower, a utility building, and a parking area for security forces. <\/p>\n<p>Work will be performed in Guam and is expected to be completed by March 2023. (USN)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>JOINT BASE PEARL HARBOR-HICKAM\u2014Naval Facilities Engineering Command Pacific awarded a $36 million firm-fixed price contract&#8230;<\/p>\n","protected":false},"author":28,"featured_media":329515,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[8982],"class_list":["post-329795","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-local-news","tag-navfac"],"_links":{"self":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts\/329795","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/comments?post=329795"}],"version-history":[{"count":0,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts\/329795\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/media\/329515"}],"wp:attachment":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/media?parent=329795"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/categories?post=329795"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/tags?post=329795"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}