{"id":6251,"date":"2012-03-27T01:28:10","date_gmt":"2012-03-27T01:28:10","guid":{"rendered":"http:\/\/newspaper.ctsi-logistics.com\/?p=6251"},"modified":"2012-03-27T01:28:10","modified_gmt":"2012-03-27T01:28:10","slug":"pss-to-unveil-state-of-the-art-bus-facility","status":"publish","type":"post","link":"https:\/\/www.saipantribune.com\/index.php\/pss-to-unveil-state-of-the-art-bus-facility\/","title":{"rendered":"PSS to unveil state-of-the-art bus facility"},"content":{"rendered":"<div>Mechanic pits, dining hall, conference room, offices, storage areas highlights of new building<\/div>\n<div>By Moneth Deposa<br \/>\nReporter<\/div>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" style=\"border: 0pt none;\" src=\"http:\/\/www.saipantribune.com\/imgupload\/issx9999ns117588.jpg\" alt=\"The Public School System's state-of the-art bus facility in Lower Base will be unveiled on April 10 after more than a year of construction using federal grants. Among its highlights are a motorpool with two mechanic pits, dining hall, conference hall, and a procurement and supply warehouse. (Moneth G. Deposa)\" width=\"100\" height=\"75\" border=\"0\" \/>\u00a0 The Public School System will be unveiling another first: a new state-of-the-art bus facility that was built with environmentally friendly materials.<\/p>\n<p>The Lower Base facility, a sprawling structure spanning 13,700 square feet, is a total transformation from the aging, worn-out facility that was on the brink of collapse when PSS decided to build a new one from the ground up in 2011.<\/p>\n<p>In a visit to the newly built building yesterday, PSS Capital Improvement Project coordinator Rachel Fusco and acting education commissioner Glenn Mu\u00f1a told Saipan Tribune that the new building will be officially unveiled on April 10 after more than a year of construction.<\/p>\n<p>Considered the largest of its kind in the region, they said the Lower Base facility meets the requirements of the Federal Transportation Administration, which, among others, prioritizes safety and environment protection.<\/p>\n<p>Funded under an American Recovery and Reinvestment Act grant, Fusco said the facility will house a motorpool with two mechanic pits, a procurement and supply warehouse, a dining hall, conference room, offices, and storage for tools and equipments, among others.<\/p>\n<p>The project cost $1.552 million.<\/p>\n<p>Mu\u00f1a gave the Saipan Tribune a tour of the facility, which he said will soon house all 19 PSS buses and eight American Disabilities Act accessible vans.<\/p>\n<p>Since construction began last year, school buses have been stationed at a temporary warehouse across the new building.<\/p>\n<p>\u201cAll the bus services will be moving in soon. Now that we don&#8217;t have extra money for buses, at least this is one way for PSS to maintain them. We&#8217;re really excited to have it opened,\u201d he said.<\/p>\n<p>Muna said the state-of-the-art facility has oil containments system, carbon-fitted insulation, and uses energy efficient LED lighting. It also has a well-designed drainage system to prevent flooding and a wash area for the buses.<\/p>\n<p>According to Fusco, PSS drivers have been working on their buses outside the old building, which is deemed unsafe. \u201cNow, it&#8217;s really a lot safer for them and our buses.\u201d<\/p>\n<p>The project was designed by SSFM International, the contractor is Tropex Garden, and the project manager is RR Group LLC.<\/p>\n<p>Two years ago, PSS launched a multimillion-dollar renewable energy program that aims to build solar panels and wind turbines in at least 10 public schools on Saipan, Tinian, and Rota. Pioneered by Saipan Southern High School, this project is ongoing and has already been hailed by the U.S. Department of Energy.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mechanic pits, dining hall, conference room, offices, storage areas highlights of new building By Moneth&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-6251","post","type-post","status-publish","format-standard","hentry","category-local-news"],"_links":{"self":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts\/6251","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/comments?post=6251"}],"version-history":[{"count":0,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/posts\/6251\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/media?parent=6251"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/categories?post=6251"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.saipantribune.com\/index.php\/wp-json\/wp\/v2\/tags?post=6251"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}