LOAD SHEDDING SCHEDULE

By
|
Posted on Aug 01 2008
Share

As the rehabilitation and maintenance repairs continue on the engines and generators at the Power Plant1, load shedding will continue to be required. However, to conform to the daily power demand the schedule will be expanded to include the entire feeder (1st and 2nd partial) in each of the respective timeslots. Therefore, the load shedding schedule for Aug. 2 through Aug. 8, 2008 will be as follows.

8am -10am Feeder-2: Entire Grid

Beach Road Garapan at Fishing Base Kristo Rai south to San Jose Intersection

10am – 12pm Kiya 1: Entire Grid

As Terlaje, NMC, portions of Fina Sisu, Lower Dandan, Isley Field, CPA/Airport, As Perdido

Feeder-3: Laterals

Taro Sue to portions of China Town, Upper Gualo Rai

12pm – 2pm Feeder-4: Entire Grid

Lower Base, Sadog Tasi, Capital Hill, Kagman and portions of Papago (Botanical Garden)

2pm – 4pm Feeder-1: Second partial

99 Cents Store and portions of Garapan, Upper Navy Hill

4pm – 6pm Feeder-7: Entire Grid

Lower Base industrial area, north to Tanapag, Achugao, San Roque, As Matuis and Marpi.

6pm – 8pm Kiya-2: Entire Grid

As Lito, portions of Fina Sisu, Koblerville, As Gonno, San Antonio and Afetnas

8pm – 10pm Kiya-4: Entire Grid

Portions of Chalan Kiya, San Jose, Oleai, Susupe, Mount Carmel and south to portions of Chalan Kanoa

Water and Wastewater services will also be affected in the respective areas as a result of the power outages. CUC will make all efforts to keep to this schedule but it may be modified in future public notices. It may also be altered to address particular emergencies when necessary. [B][I](CUC)[/I][/B]